Great Yarmouth Borough Council

Plan timetable

About this data

We accept data in different formats and standardise it, so that we can combine it with data from other sources. This means the data we show might be in a different format to the data you provided. For example, we standardise all dates as YYYY-MM-DD.

The information within this data is from all 2 of your endpoints.

Reference Plan Plan event Event date Actual date Entry date Notes
Great-Yarmouth-Local-Plan-2045-plan-publish-notice-intention-commence Great-Yarmouth-Local-Plan-2045 publish-notice-intention-commence 2026-06-30 2026-06-30 Publishing the notice of intention to commence Local Plan preparation is a new requirement. It gives communities and stakeholders advance notice of plan making and sets out when and how they can get involved. The notice must be published at least 4 months before Gateway 1.
Great-Yarmouth-Local-Plan-2045-scoping-consultation-start Great-Yarmouth-Local-Plan-2045 scoping-consultation-start 2026-08-24 2026-07-30 This is a new requirement and seeks to ask what people would like to see in their Local Plan and how they want to be engaged in the process.
Great-Yarmouth-Local-Plan-2045-scoping-consultation-end Great-Yarmouth-Local-Plan-2045 scoping-consultation-end 2026-10-05 2026-07-30 All comments (representations) on the scoping consultation must be received on or before this date.
Great-Yarmouth-Local-Plan-2045-call-for-sites-consultation-start Great-Yarmouth-Local-Plan-2045 call-for-sites-consultation-start 2026-08-24 2026-07-30 An opportunity for stakeholders to submit sites for consideration in the new Local Plan. This is not a formal consultation required by legislation.
Great-Yarmouth-Local-Plan-2045-call-for-sites-consultation-end Great-Yarmouth-Local-Plan-2045 call-for-sites-consultation-end 2026-10-05 2026-07-30 All sites must be received on or before this date.
Great-Yarmouth-Local-Plan-2045-gateway-1-self-assessment Great-Yarmouth-Local-Plan-2045 gateway-1-self-assessment 2026-10-30 2026-06-30 This new requirement is a self assessment summary confirming that we have published the timetable and notice, completed the scoping consultation, and have a project plan in place to begin the formal stage of preparing the Local Plan. Once we complete Gateway 1, we have 30 months to prepare and adopt the plan.
Great-Yarmouth-Local-Plan-2045-content-evidence-consultation-start Great-Yarmouth-Local-Plan-2045 plan-content-evidence-consultation-start 2027-04-01 2026-06-30 This second formal consultation sets out the proposed vision, aims and objectives, and a summary of the policy topics the plan will cover. We will also publish a summary of the evidence proposed to support the plan. This stage should will provide an opportunity to comemnt on submitted sites.
Great-Yarmouth-Local-Plan-2045-content-evidence-consultation-end Great-Yarmouth-Local-Plan-2045 plan-content-evidence-consultation-end 2027-05-01 2026-06-30 All comments (representations) on the proposed Local Plan content and evidence consultation must be received on or before this date.
Great-Yarmouth-Local-Plan-2045-gateway-2-advice-sought Great-Yarmouth-Local-Plan-2045 gateway-2-advice-sought 2027-09-01 2026-06-30 This new requirement is a formal method of obtaining feedback from a planning inspector on the draft plan and supporting evidence, ensuring our approach aligns with national policy, guidance and legislation.
Great-Yarmouth-Local-Plan-2045-gateway-2-advice-published Great-Yarmouth-Local-Plan-2045 gateway-2-advice-published 2027-10-01 2026-06-30 Date of publication will depend on the duration of Gateway 2.
Great-Yarmouth-Local-Plan-2045-proposed-plan-consultation-start Great-Yarmouth-Local-Plan-2045 proposed-plan-consultation-start 2028-04-01 2026-06-30 This 8 week consultation is on the final version of the plan and includes the proposed site allocations.
Great-Yarmouth-Local-Plan-2045-proposed-plan-consultation-end Great-Yarmouth-Local-Plan-2045 proposed-plan-consultation-end 2028-05-01 2026-06-30 All comments (representations) on the proposed Local Plan consultation must be received on or before this date.
Great-Yarmouth-Local-Plan-2045-gateway-3-advice-sought Great-Yarmouth-Local-Plan-2045 gateway-3-advice-sought 2028-09-01 2026-06-30 This new requirement is a final check by an external assessor to confirm the plan meets planning regulations and the tests of soundness, before formally submitting it for Examination.
Great-Yarmouth-Local-Plan-2045-gateway-3-advice-published Great-Yarmouth-Local-Plan-2045 gateway-3-advice-published 2028-10-01 2026-06-30 Date of publication will depend on the duration of Gateway 3.
Great-Yarmouth-Local-Plan-2045-examination-submitted Great-Yarmouth-Local-Plan-2045 examination-submitted 2028-10-01 2026-06-30 The proposed Local Plan must be submitted for an independent Examination carried out by a Planning Inspector. The Examination should last no longer than 6 months.
Great-Yarmouth-Local-Plan-2045-adopted Great-Yarmouth-Local-Plan-2045 adopted 2029-04-01 2026-06-30 Consideration of adopting the proposed Local Plan as the development plan for the Borough